Maman Maman Calculators
Link copied! 📋
Inputs
Width
Length
Thickness
Cost per ton optional
Results
Cubic Yards
Hot Mix (Tons)
Total Cost
NOTE: Estimating tool only. Add 5–10% for waste. Hot mix density: 145 lb/ft³.
Concrete Slab
🧱Concrete Wall
🔩Concrete Footing
🏛Concrete Column
Circle Slab
🪜Concrete Stairs
NOTE: Always add 8–10% for waste. Cure minimum 7 days.
Inputs
Width
Length
Thickness
Material
Cost per ton optional
Results
Tons
Cubic Yards
Total Cost
NOTE: Estimating tool only. Results vary with moisture content.
Curb Depth Curb Height Gutter Flag Length
Inputs
Curb Depth (in)
Curb Height (in)
Gutter Width (in)
Flag Thickness (in)
Length (ft)
Cost per yard optional
Results
Cubic Yards
60 lb Bags
80 lb Bags
Total Cost
NOTE: Cross-section = (Depth × Height) + (Gutter × Flag). Add 8% waste.
Areas / Rooms
Summary
Number of areas0
Total Square Footage0 SF
+ 10% waste0 SF
Quick Price Estimate
Estimated Total