NOTE: Estimating tool only. Add 5–10% for waste. Hot mix density: 145 lb/ft³.
Volume—
+8% waste—
Mix strength—
Estimated cost—
NOTE: Always add 8–10% for waste. Cure minimum 7 days.
NOTE: Estimating tool only. Results vary with moisture content.
NOTE: Default dimensions are standard curb & gutter. Adjust if needed.
NOTE: Cross-section = (Depth × Height) + (Gutter × Flag). Add 8% waste.